SUPERIOR FLUID SOLUTIONS · CNG BUYING GUIDE
CNG Station Equipment: The Instrument Fittings List
The tube, valve and fitting items that sit between the compressor, the storage banks and the dispenser, and what a buyer should write on the order.
A CNG station equipment list has two halves: the large packages a station builder supplies, and the tube, valve and fitting items that tie them together. This post covers the second half for fleet and station buyers working at 3,600 psi service. Our CNG products page shows the valve range. According to the US Department of Energy’s Clean Cities program, in a 2014 government webinar, the compressor raises gas to the level needed to fill a vehicle to 3,600 psi, and the station adds storage, a dispenser and a gas dryer around it.
CNG Station Equipment, Stage by Stage
The order of the chain matters because the pressure changes at every step. A design article by Rob Adams of Marathon Corporation, reposted by Government Fleet, says the US CNG industry has standardized on 3,600 PSIG vehicle pressure. It describes compressors as reciprocating piston machines discharging at 4,500 PSIG, and it recommends drying the gas at the inlet rather than at high pressure because that costs less and is safer at low pressure. It sets the minimum design pressure for storage at 5,500 PSIG, arranged in three banks. The article is undated, so check any figure against your own design basis.
| Stage | Pressure reference | Items to list |
|---|---|---|
| Inlet dryer | Low-pressure gas line; DOE example inlets run from 5 to 30 psi | Tube fittings, isolation valves, filter connections |
| Compressor | 4,500 PSIG discharge | Discharge isolation, gauge valves, relief connections |
| Priority panel | Between compressor, storage and dispenser | Valves, check valves, tube runs between banks |
| Storage | 5,500 PSIG minimum design | Isolation, drain and bleed valves |
| Dispenser | 3,600 PSIG fill reference; hose rated 5,000 PSIG | Filters, shutoff and gauge valves, tube to the hose |
The priority panel needs its own line on the list. The same article describes electronically controlled priority fill from compressor to storage, and sequencing from storage to vehicle. The DOE webinar lists one half-inch, fleet-size priority panel in its worked example.
What a Buyer Specifies on Each Line
Pressure rating with headroom. Compare the component rating with the stage, not with the 3,600 psi on the vehicle. According to the Superlok North America datasheet for its CNG ball valve series, which is a manufacturer publication, the SBVF360 and SBT valves are rated 6,000 psig with PEEK seats, across -40°F to 250°F, and the SBVF360 figure is stated at 70°F. Against a 5,500 PSIG minimum storage design pressure, that leaves 500 psi of margin on paper at room temperature. Ask for the rating at your operating temperature, not only the headline figure.
Material and seal. The datasheet lists SS316 bodies and balls on those two series. Our tube fittings are listed in 316 stainless steel, a corrosion-resistant grade, and the grade is confirmed per order. Tube runs ending in Superlok® fittings carry the finest interior surface finish of any tube and pipe fitting on the market. Ask the same question of every packing and seal: which material, and rated to what.
Leak test. The datasheet states that each SCBV360 and SBVF360 valve is nitrogen tested at 1,000 psig with a maximum leak rate of 0.1 SCCM. That is a factory test on the valve alone. NFPA’s first draft report for the next edition of NFPA 52 separately calls for piping, tubing and hose assemblies to be leak tested after assembly at no less than the maximum operating pressure of that part of the system. Plan the field test as well as the valve test.
Relief and shutoff. The same NFPA draft says a relief valve setting must not exceed the maximum allowable working pressure of the line it protects, and that dispenser shutoff valves must pass a hydrostatic test at four times rated operating pressure. It is a draft, so confirm the current edition with your authority having jurisdiction. Start from our relief valves page when the list includes pressure protection.
Filtration and gauging. The Adams article lists coalescing filters on time-fill dispenser manifolds. See inline filter options, and gauge valves for pressure instrument isolation.
Buying for Build-Outs and the Installed Base
Clean Trucking reported, in an article updated 3 August 2026, that 1,385 CNG stations operate across 47 states and Washington, DC, with California leading at 318. That installed base needs replacement parts as well as new builds. Our guide to the back-ordered fitting problem explains how to match by form, fit and function, and material test reports for fittings covers the paperwork a station inspector may ask for.
Two habits save time. Send the station’s design pressure and gas inlet pressure with the first request. And separate fast-fill from time-fill in the list: the DOE slides say fast-fill gives fill times similar to a gasoline station, while time-fill can take several minutes to many hours, and a combination station uses its compression day and night.
Three omissions that delay a station parts order:
No pressure stage
A list that says “3,600 psi” without naming the stage forces a call back.
No end connections
Name NPT or tube size on each side of every valve.
No paperwork request
Ask for test reports at order, not after delivery.
Buyer Questions on Station Parts
What fill pressure should I design the instrument side for?
The vehicle fill pressure is 3,600 PSIG, but the lines upstream see more. The sources above describe 4,500 PSIG compressor discharge and a 5,500 PSIG minimum storage design pressure, so size to the stage.
Do you supply the compressor, storage and dispenser?
This guide covers the tube, valve, filter and fitting items. The compressor package, ASME storage and dispenser come from the station builder or equipment maker.
Does the CNG datasheet state NGV or CSA approvals?
The datasheet we reviewed lists ASTM material specifications and a factory test, and does not state NGV, CSA or ANSI approvals. If your inspector needs one, ask per order.
Is the 6,000 psig rating enough for every station stage?
Not automatically. The SBVF360 figure is stated at 70°F, and temperature, cycling and your design code can all change the answer. Send the stage pressure and temperature for a quote.
Send the stage list, get a quoted parts set
Stage, pressure, temperature and end connections are enough to begin.
SUPERIOR FLUID SOLUTIONS
Station parts listed by pressure stage, quoted against your design basis.
Sources
- US Department of Energy, Clean Cities, “CNG Infrastructure Cost Webinar,” 16 September 2014 (government slides). Supports the 3,600 psi fill, component roles, the priority panel example, inlet pressures and fast-fill versus time-fill. cleancities.energy.gov
- Rob Adams, Marathon Corporation, “Designing a CNG Fueling Station,” reposted by Government Fleet (undated). Supports 3,600 PSIG standardization, 4,500 PSIG discharge, 5,500 PSIG storage design, three banks, inlet drying, priority fill, hose rating and filters. greenfleetmagazine.com
- NFPA, NFPA 52 first draft report, 2023 edition cycle, printed 13 March 2024 (draft text, not the adopted code). Supports leak testing after assembly, relief setting limits and shutoff valve hydrostatic test wording. nfpa.org
- Superlok North America, “Compressed natural gas products” datasheet (manufacturer publication). Supports series ratings, temperature range, materials and the factory leak test. superloknorthamerica.com
- Clean Trucking, “CNG and LNG fueling stations to expand in 2026,” updated 3 August 2026 (trade press). Supports the station counts. cleantrucking.com
- Superior Fluid Solutions, CNG products page (distributor publication). Supports the listed Superlok® CNG valve series. superiorfluid.com
Technical note: The sources establish the station stage pressures as described in one design article and DOE slides, the manufacturer’s published ratings and factory test, and the station counts reported by trade press. They do not establish current NFPA 52 requirements, because the text we read is a draft, nor any NGV or CSA approval for a Superlok® part, nor the priority panel contents. The design article is undated and the DOE slides date from 2014. Grade and rating are confirmed per order.
Trademark disclaimer: Superlok® is a registered mark of its owner. NFPA, Government Fleet and Clean Trucking are named only to identify sources. Cross-references are made by form, fit, and function only.